Blasting


The charged holes are blasted at the designated primary blasting  time.In line with stipulated safety requirements, an hour re-entry  period is observed after primary blasting. Blasted ore is then lashed  onto the sacrificial conveyor belt through a grizzly with 0.4m x0.4m  aperture. The ore is discharged onto the strike conveyor belt to the  bunker. From there, it is conveyed through the main dip belt to the  surface stockpile.